CASE STUDIES

Internal Cleaning: Multiple 20″ I-Tubes in the Gulf of Mexico

Overview

AISUS successfully conducted an internal cleaning of multiple 20” I-Tube FFL2 units on a US platform in the Gulf of Mexico. The primary goal was to remove the accumulated marine growth, ensuring smooth passage of a drift tool through the I-Tube for future operations.

 

Requirement

The client urgently requested AISUS’ assistance, and we delivered impressively, especially given the international scope of the project. Thick marine growth within the I-Tube had delayed the client’s drift tool operations, causing friction and snagging, as well as damaging the tooling. The 20″ I-Tube consisted of three sections each 1.5m long, separated by two 34m water gaps. AISUS had to develop a solution to safely navigate the cleaning tool through these cut-out water gaps.

Solution

AISUS deployed the ‘SIRIUS’ tool, which carried an Ultra-High Pressure (UHP) water jetting unit internally through the I-Tubes. The team deployed the tool safely from the top deck, manoeuvring it through the 34m cut-out gaps to clean the top, middle, and lower sections of the 1.5m I-Tubes. The UHP water jetting unit effectively removed the ‘thick and hard’ marine growth.

Results

AISUS mobilised this project in impressively quick time for an international operation. Within 7 days, the project was agreed with the client, complete with supporting proposals and drawings. The AISUS team was promptly flown from the UK to New Orleans, ready to execute the task. The entire work scope was completed within 6 days, demonstrating AISUS’ efficiency in meeting the client’s expectations. The cleaning removed all marine growth from the I-Tubes, restoring them to their parent material and extending into the upper and lower bellmouths. Post-cleaning inspections revealed a smooth surface with no anomalies. A centraliser frame set to 19.5” was successfully lowered through the top, middle, and lower I-Tubes, confirming that the internal space met the client’s requirements without any snagging or friction.

 

 

Benefits

Rapid Mobilisation: Quick deployment of the team for an international project.

Swift Agreement: Project scope and plans were agreed upon with the client within seven days.

Readily Available Tools: ‘Off the shelf’ tools ready for immediate mobilisation.

Integrated Service: All tasks completed within a single service.

Reduced Personnel Needs: No rope access or divers required, minimising personnel costs.

Cost-Effective: Prevented further marine growth that could halt operations or damage tools.

Expert Team: Delivered precise and reliable results, providing personalised support to maintain high standards, quality, and safety.

Cost Saving: The client cut costs using our remote solutions within a single deployment in only 6 operation days.

 

Get in Touch

Recent Case Studies

Internal Visual Inspection & Ultrasonic Testing within a Seawater Lift Caisson

Overview AISUS delivered internal visual, cleaning, and ultrasonic thickness (UT) inspection of a seawater lift caisson on an offshore platform in the Dutch Sector. The project highlighted AISUS’ ability to mobilise at short notice to global locations. The inspection equipment was requested on a Thursday, mobilised by the following Tuesday, and the AISUS team was […]

Internal Visual Inspection & Fluid Sample Collection within a Riser Caisson

Overview AISUS was engaged on a North Sea offshore platform to carry out internal visual inspection and fluid sample collection through a 3” standpipe within a riser caisson. A single mobilisation covering both inspection for anomalies and fluid sampling delivered added value to the client without the need for additional mobilisations. Requirement The client required […]

Zero Visibility – Internal Visual & Ultrasonic Inspection of J-Tubes

Overview AISUS mobilised to an offshore platform in Australia to carry out internal inspections on two J-tubes, with the objective of assessing the extent of external wall loss. The collected data was used to evaluate the condition of the platform legs by correlating it with the observed J-tube external wall corrosion. The platform legs are […]