CASE STUDIES

Full Inspection of Multiple J-Tubes on Middle Eastern Platform

J-Tube Inspections

AISUS was contracted to clean and conduct a thorough internal inspection of eight J-tubes on an offshore platform within the Middle East, to ensure their structural integrity.

Understanding the ovality of the J-tubes is critical, especially for pull-through umbilical lines, helping to identify internal obstructions. Ultrasonic testing provided corrosion data, while laser profiling displayed surface defects within a 3D model.

 

 

Project Requirement

The project required a detailed, multi-stage inspection process in a comprehensive report that left no details overlooked. AISUS delivered a streamlined solution which included reinstalling the messenger lines after inspection.

A custom remote crawler equipped with a camera, designed for J-tube inspections, featured bend capabilities, allowing navigation of the tubes’ curves efficiently.

AISUS prepared to safely cut and remove the messenger wire ready, however, due to blockage in the J-Tubes, our crawler with hydraulic shear could not proceed past the objects tied in the wire. Therefore, an ROV cut five of the J-tubes before the AISUS inspection. This stage also included our high-pressure water jet cleaning to remove marine debris and corrosion scale.

The inspection comprised of ultrasonic wall thickness testing to identify corrosion and assess ovality, ensuring structural integrity to prevent messenger line snagging during platform operations. Laser profiling created a 3D model to highlight surface defects and areas of concern.

After inspection, the crawler equipped with gauge plates finalised the evaluation of the J-tubes internal structure, clarifying any misshapen or protruding welds. A final visual inspection verified cleanliness, with before-and-after comparisons provided through our data management platform. The messenger lines were successfully reinstalled in all eight J-tubes, ready for future use.

 

 

Challenges

This comprehensive inspection was time-intensive and involved multiple techniques. Each J-tube faced significant blockages and marine debris near the bell mouth, which required extensive high-pressure jetting.

Limited visibility initially made inspections difficult even after flushing, and the crawler had to navigate bends carefully, especially near termination areas.

 

The AISUS Solution

Remote topside control allowed seamless operation and real-time data analysis. High-pressure jetting removed marine growth and corrosion scale, ensuring a smooth surface for accurate data collection. A camera was remotely deployed to identify obstructions and verify cleaning quality before ultrasonic testing.

Ultrasonic wall thickness testing provided real-time C-scan data, offering a detailed assessment of wall thickness. Laser scans provided an internal profiling, surface defects and weld circumferences. The crawler, equipped with gauge plates, confirmed structural integrity and identified any anomalies post inspection.

 

Results

AISUS delivered a thorough inspection of the J-tubes, providing the client with a comprehensive assessment and validated structural condition.

Visual inspection confirmed the removal of blockages and cleaning quality.

Circumferential welds were identified, with ultrasonic testing revealing minimal anomalies.

Only a few areas showed external wall loss, as indicated by ultrasonic and laser data.

Overall, the J-tubes were in good condition. All findings, including visual, ultrasonic, and laser data, were securely stored on AISUS’ online data management platform, enabling historical comparisons for future inspections.

 

Key Benefits:

  • Extensive and Accurate Data Collection: Detailed inspection ensured no detail was overlooked, mitigating future risks.
  • Real-Time Results: Enabled quick decision-making, minimising downtime within a single streamlined project.
  • Increased Safety: Fully remote inspection eliminated the need for a large team.
  • Cost-Effective: Reduced personnel requirements and vendor costs.
  • Streamlined Reporting: Secure access to comprehensive reports for inspection data.

 

Reach out to the AISUS team to find out more, Contact AISUS

 

AISUS Full Inspection on Multiple J Tubes, Middle East Case Study Video.

 

Recent Case Studies

Internal Visual and 98% gauge plate inspection of I-Tubes

Overview  AISUS carried out an internal visual and gauge plate inspection of three I-Tubes on an FPSO, mobilised to Nigeria, Africa.  This client needed AISUS expertise and technology to ensure feasibility and no disruptions to the pull through of subsea umbilicals at a 98% internal diameter.     Requirement  An Initial visual inspection was carried out to assess the cleanliness of the I-Tube to ensure there were no […]

Remote Visual Inspection: Onshore Windfarm Cable Duct

Overview   The client required AISUS to inspect the full length of a 94m duct used to pull cables through from an onshore windfarm. Previously failed to be inspected by other operators the client needed AISUS specialised inspection equipment to gather urgent and actionable data – finding the extent of the blockage and getting the […]

Preparing for Redundancy: External Caisson Cleaning and RVI

Overview AISUS was contracted by a North Sea operator to carry out external high-pressure jetting and remote visual inspection on two sea water lift caissons. The work formed part of the preparation for making the caissons redundant, with the key objective being the removal of marine growth, scale, and corrosion products, followed by a detailed […]
ENQUIRE NOW